OPS design project
We prepare an OPS design per FVV (MChS) requirements: loops, detectors, control panel, SOUE and integration with smoke extraction.
We design, supply and install automatic fire alarm and notification systems (OPS) for offices, warehouses, shopping centers and industrial facilities — and provide ongoing maintenance. Turnkey fire alarm: from design and commissioning to scheduled maintenance and repairs, as well as integration with fire suppression systems, smoke extraction and voice evacuation. We deliver comprehensive fire safety and help you pass acceptance with FVV (MChS).
Get an approximate cost
OPS: design, installation, commissioning and service. Conventional / addressable. Tashkent, Uzbekistan.
We prepare an OPS design per FVV (MChS) requirements: loops, detectors, control panel, SOUE and integration with smoke extraction.
We install detectors, call points, panel, sounders and beacons; lay cable lines and follow fire-resistant routing standards.
We configure the control panel: addressing, zones, activation scenarios. We test loops and set up logs and supervision.
We run final tests, prepare as-built documentation and support you through FVV (MChS) inspection until acceptance is obtained.
We focus on safety, compliance and convenient operation of the OPS system.
We visit quickly, perform an audit and propose a solution that considers deadlines and FVV (MChS) requirements.
Our engineers have valid permits for fire automation and strong experience with addressable and conventional systems.
We design OPS as part of a unified safety system: we integrate it with video surveillance, access control and building engineering systems.
We provide up to 3 years warranty and offer a scheduled maintenance contract with planned visits and system supervision.
Fire alarm system: from the first inspection to design, installation and regular maintenance.
We visit the facility and analyze layout, fire risks, existing cable routes and already installed systems (OPS, fire suppression, smoke extraction). We capture customer requirements and FVV (MChS) constraints.
We develop the OPS design per applicable standards: detector placement, loop schemes, connection nodes, power and redundancy calculations. The design considers final acceptance by FVV (MChS).
We install detectors, control panel, sounders, beacons, interface modules and cable lines. We formalize concealed works acts and follow installation heights, spacing and fire resistance requirements for routes.
We program the control panel, define supervision zones and scenarios for alarms and engineering controls. We test loops, simulate fire conditions and record results in test protocols.
We prepare as-built drawings, concealed works acts, test protocols, equipment lists and the OPS system passport for FVV (MChS) and the operating organization.
We support you during the inspection, demonstrate OPS and integrated systems operation, resolve comments promptly and bring the facility to readiness until the final acceptance act is obtained.
We sign a maintenance contract: quarterly inspections, scheduled cleaning and diagnostics, rapid response in case of faults, and support during re-inspections.
Fire alarm systems implemented at industrial, warehouse and office facilities.
Fire alarm installation at a 72,300 m² TPP site: integration with SOUE and engineering equipment. Syrdarya.
Security & fire alarm at a 15,163 m² food warehouse: monitoring of cold rooms and storage zones. Ohangaron.
OPS and SOUE implemented at a 6,163 m² IT-Park: integrated with access control and evacuation notification systems. Tashkent.
Official partners and equipment suppliers for fire alarm systems and integrated safety solutions.
TESCOM ENGINEERING provides fire safety and OPS: design, installation, commissioning, testing and maintenance. Integrated solutions: fire alarm systems, fire suppression, smoke extraction, voice evacuation and other engineering systems. We support handover to FVV (MChS) and ongoing operation. We prepare correct documentation and strictly follow standards and requirements.
Short answers to frequently asked questions about fire alarm (OPS) systems.
A typical system includes a fire alarm control panel (FACP), smoke and heat detectors, manual call points, sounders and visual beacons, cable lines, backup power, and interface modules to control evacuation and building engineering systems.
Yes — without a project, the system is usually not accepted by FVV (MChS). Proper design defines the number and type of detectors, loop schemes and connection nodes with fire suppression, smoke extraction and notification, and reduces installation risks.
At least once per quarter is recommended. We check detectors, lines, power supply, the panel log, perform functional tests and preventive cleaning — so the system works reliably in a real emergency.
The price depends on area and ceiling height, number of points (detectors), routing complexity, panel type and integration with other systems. Below you can see reference prices and point-based estimates; for an exact quote use the online calculator or request an engineer visit.
OPS installation prices: detectors, control panel, cable routing, loop works. Point-based evaluation.
| Service name | Unit | Price, UZS |
|---|---|---|
| Site visit, inspection of the facility and marking of points | visit | 450 000 |
| Fire alarm system design (OPS) | site | from 6 000 000 |
| Voice evacuation system design (SOUE) | site | from 4 500 000 |
| Approval and commissioning support (Emergency Ministry / supervision / commission) | site | from 6 000 000 |
| Installation of smoke detector (conventional) | pcs | 178 000 |
| Installation of smoke detector (addressable) | pcs | 210 000 |
| Installation of heat detector (conventional) | pcs | 178 000 |
| Installation of heat detector (addressable) | pcs | 210 000 |
| Installation of flame detector or linear detector (1 head) | pcs | 683 000 |
| Installation of manual call point (IPR) – conventional | pcs | 196 000 |
| Installation of manual call point (IPR) – addressable | pcs | 230 000 |
| Installation of input/output module (addressable or relay) | pcs | 458 000 |
| Installation of line isolator | pcs | 372 000 |
| Connection of siren/display control via module | pcs | 210 000 |
| Integration of fire alarm with ventilation, access control (ACS), elevators via relay | point | 420 000 |
| Installation of door monitoring sensor (SMK) | pcs | 280 000 |
| Installation of fire alarm siren 24V | pcs | 358 000 |
| Installation of siren with light indication | pcs | 418 000 |
| Installation of display signs “EXIT”, “FIRE” (24V) | pcs | 350 000 |
| Installation of display signs “GAS! DO NOT ENTER”, “Automation Disabled” (24V) | pcs | 420 000 |
| Installation of loudspeaker (voice evacuation system) | pcs | 420 000 |
| Installation of amplifier/controller for voice evacuation system | pcs | 2 400 000 |
| Installation of “START-STOP”, “RESET” buttons | pcs | 420 000 |
| Installation of fire alarm control panel (up to 8 zones) | pcs | 1 580 000 |
| Installation of S2000-M (control panel / controller) | pcs | 2 950 035 |
| Installation of S2000-KPB, S2000-KDL (line controller) | pcs | 1 340 346 |
| Installation of power supply unit RIP, ShPS-24 with battery | pcs | 3 291 233 |
| Installation of addressable device (other models) | pcs | 1 873 000 |
| Installation of terminal distribution panel (12–24 terminals) | pcs | 947 000 |
| Assembly and wiring inside fire alarm cabinet (DIN rail, terminals, labeling) | cabinet | from 2 500 000 |
| Installation or replacement of battery (1 pc) | pcs | 220 000 |
| Configuration of GSM/Ethernet event transmission | pcs | 2 650 000 |
| Configuration of connection to monitoring center / dispatch system | site | from 2 800 000 |
| Installation of KPSng-FRLS cable 2×0.75–1.5 on open surface | m | 15 000 |
| Installation of RS-485 cable on open surface | m | 18 000 |
| Installation of VVGng-LS cable 3×1.5-2.5 on open surface | m | 20 000 |
| Installation of PVC cable channel | m | 18 000 |
| Installation of metal cable tray | m | 42 000 |
| Installation of junction box | pcs | 95 000 |
| Wall chasing for cable | m | 45 000 |
| Drilling hole for cable passage | pcs | 65 000 |
| Sealing of cable penetration | pcs | 80 000 |
| Fire-resistant sealing of cable penetration | pcs | from 350 000 |
| Commissioning of fire alarm system | site | from 4 000 000 |
| Commissioning of voice evacuation system | site | from 3 500 000 |
| As-built documentation (schematics, cable log, reports) | site | from 7 500 000 |
| Removal of detector, manual call point, or sign | pcs | 85 000 |
| Cable and device labeling | point | 35 000 |
| Testing of fire alarm point | point | 45 000 |
| Work at height (above 3 m) | coef | 1.20 |
| Night or weekend work | coef | 1.5 |
| Fire alarm system maintenance (monthly) | site | from 4 200 000 |
| Emergency visit (on-site diagnostics) | visit | from 650 000 |
| Installation of fire alarm point | point | 364 000 |
💡 The final installation cost and point price depend on the facility area, routing complexity, system type (conventional or addressable) and selected equipment. The installation price list is a reference. For an exact estimate, you can fill out the online form or contact us by phone.
Get an exact estimateTESCOM ENGINEERING is an engineering and low-voltage systems company. We have an office in Tashkent, and our engineer can visit sites across the city and the region.